|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Automation |
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The Activitiy Area |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Consulting and perceiving the customer’s requirements; Development of the new solutions; Replacement of existing obsolete, difficult available or malfunctioned devices with the new ones; Improvement of the existing systems; Visualisation and tracing the existing processes; Training courses for the plant staff; The required support during the exploitation of the assembled projects. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Consulting and perceiving the customer’s requirementsOn site observation of the customer’s requirements; Collecting of the data and figures required to develop the project; Rough project design; Respond to the customers requests; Overall time and financial calculation schedule.Development of the new solutionsModular project design; Exact time and financial calculation schedule; Final consulting with customer to clear out eventual misunderstandings; The project design in company as well with support from partners; Creation of the documentation for the finished parts of the project; Erecting the finished parts of the project; Functional testing of the erected project units and commissioning; Putting the finished system in experimental operation; Observing for eventual malfunctions and faults; Final acceptance of the system.Optimising the existing solutionsThe project exploring to improve characteristics, reduce the costs and simplify the managing of the process; Estimating the costs of using the existing equipment compared to the new one; Exact time and financial calculation schedule; Final consulting with customer to clear out eventual misunderstandings; The project and documentation design in company as well with support from partners; Installing the equipment and functional testing; Putting the optimised system in experimental operation and observing for eventual malfunctions and faults; Final acceptance of the equipment.Replacement of existing obsolete, difficult available or malfunctioned devices with the new onesFor obsolete, difficult available or malfunctioned devices the equivalent or extended function replacement is found; Calculation to decide to replace the device with the same or to use the different device with the same or extended function; Spreading of investment through step-by-step modernisation; Exact time and financial calculation schedule; Final consulting with customer to clear out eventual misunderstandings; The project and documentation design in company as well with support from partners; Functional testing of the devices; Putting in experimental operation and observing for eventual malfunctions and faults; Final acceptance of the equipment.Improvement of the existing systemsThe project exploring to insert the new functions according to the customer’s requests: improving the characteristics, lowering the costs and simplifying the operation by modern system platforms; Calculation to estimate to use the existing or new equipment (the new equipment may include some function that other part of old equipment supports); Exact time and financial calculation schedule; Final consulting with customer to clear out eventual misunderstandings; The project and documentation design in company as well with support from partners; Installing and functional testing of the devices; Putting in experimental operation and observing for eventual malfunctions and faults; Final acceptance of the equipment.Visualisation and tracing the existing processesVisualisation includes the clear and user friendly presentation of the process state and flow. It emphasises the exceeding of the warning or protection criteria, ending of the procedures, etc.; The visualisation is not determined by the use of the equipment of the 3rd part suppliers; Visualisation is installed as the upgrade to the existing customer’s system.Training courses for the plant staffTraining course is the usual continuance of the work after the project realisation; The stuff is systematically introduced to care for the equipment of the plant to reduce the risk of faulty operation and efficiently handles with sophisticated technologies to increase the plant availability; Depending on the installed equipment, the training model is: Basic, for experienced stuff and smaller equipment modifications; Extended, for the projects as visualisation; Complete, for the new projects and the projects that consider the customer’s own maintenance of the plant.The required support during the exploitation of the assembled projectsThe plant operation claims the periodical maintenance, inspection, auditing and replacement of the worn out devices; The exploitation support decreases the time needed for maintenance, provides the accurate replacement of the devices and lessens the possibility of the failures from the unqualified handling; The support may be: Basic, including consulting for maintenance and replacement the worn out devices; Extended, including inspection the equipment on site and assistance in equipment maintenance; Complete, including full on site inspection, maintenance, auditing, detection and replacement together with maintenance reports with recommendations regarding further plant operation. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||